Uncover ten common tricks of stealing work in deco

2022-07-22
  • Detail

Many young people don't know anything about decoration for the first time, and they are easily cheated by bad decoration companies. Jerry built houses lead to poor decoration quality. It is suggested that you should find an experienced friend to check it occasionally, find out the construction fishiness in time, and safeguard your legitimate rights and interests

many young people don't know anything about decoration for the first time, so they are easy to be cheated by bad decoration companies and cut corners, resulting in poor house decoration quality. It is suggested that you should find an experienced friend to check it occasionally, find the construction greasy in time, and safeguard your legitimate rights and interests

brand store: Lanqing decoration Manchester City decoration

1 base treatment steal index: ★★★★

phenomenon: before painting latex paint and paving wall and floor tiles, we must do a good job in base treatment. Some workers cut corners in this aspect during construction, which may cause uneven walls, color difference after latex paint is applied, or discoloration and falling off of latex paint, or poor pasting of ceramic tiles

experts remind: in the paving construction of wall and floor tiles, you should pay attention to that the tiles cannot be directly paved on the surface of lime mortar, lime paste, paper reinforced lime paste, machete lime paste and emulsion paint, but only after the base surface is cleaned and roughened. The bonding slurry used between the ceramic tile and the base shall be prepared in strict accordance with the construction standards and proportions, and the cement and bonding adhesive materials with the specified grades shall be used, which cannot be prepared at will. When applying emulsion paint, you must pay attention to whether the wall putty is evenly and smoothly applied, and whether the grinding and rolling are in place. In addition, you should pay attention to whether the emulsion paint is mixed with water properly

2 ground leveling work stealing index: ★★★★

phenomenon: the ground of some houses is not flat enough and needs to be re leveled during decoration. If workers are not careful enough or deliberately rough, it will cause “ The more you find, the more uneven ” And the cement mortar used in the construction will greatly increase the ground load and bring hidden dangers to the safety of the building. If the normal operation is not protected, the sand will return seriously, and some only sprinkle a layer of cement on the sand to cover the owner

experts remind: before the ground leveling, the base treatment of the ground must be done first, and then the ground leveling with cement mortar. After the cement dries out, use a special level to determine the flatness of the whole ground. If you find the cement peeling, pry it open and have a look. Then proceed to the next step of construction

3 facet processing steal index: ★★★★

phenomenon: the so-called “ Facet ”, That is, some small places that consumers can't see and don't pay much attention to, such as the upper edge of the door, the bottom of the windowsill, the inside of the heating hood, and so on. Some workers will cut corners here, and even don't do any treatment

experts remind: remember that any object has six planes, and don't ignore any detail when checking the project quality

4 steal index of wire threading: ★★★★

phenomenon: in home decoration construction, almost all wires are threaded in PVC pipes and buried in the wall. Therefore, after the wire is threaded into the PVC pipe, the consumer cannot see it at all, and it is difficult to replace it. If the workers are not careful in operation, the wires will be twisted in the pipe, causing hidden dangers of electricity. If workers deliberately cut corners, they will use wires with connectors or thread several wires in the same PVC pipe

experts remind: consumers had better check and accept the wires they bought, and then supervise the workers' operation on site. After installation, they should conduct power on inspection. In addition, consumers must let the construction party leave a “ Pipeline diagram ”. When the electrician just buries the wires into the wall, he can number these walls and draw a plan, then draw the direction and specific position of the wires with a pen, indicating the direction from the floor above, from the ground below and adjacent to the wall, especially the joint position of the pipeline, so that once there is a fault, the line position can be found immediately

5 joint decoration steal index: ★★★ ★

phenomenon: in some walls and doors, windows, and two different colors of paint docking place, is also where workers often perfunctory. You often see that the coatings between emulsion paint and wood are mixed with each other, and various problems occur at the joints. What's more, the wood is painted with wall paint

experts remind that the treatment of joints is very important, and you must supervise the workers to work carefully. If there are two colors of paint connected on the wall, the adhesive tape must be pasted on the edge of the first color during the construction, and then the paint of another color must be painted on it, so as long as the adhesive tape is torn off after the construction, the whole joint can be very neat

6 wall grooving index: ★★★★

phenomenon: buried pipelines must be grooved on the wall and ground before they can be buried. A few workers carried out brutal construction during the slotting operation, which not only damaged the load-bearing structure of the building, but also may cause damage to other nearby pipelines

experts remind: before construction, confirm the direction and location of the pipeline with the construction team leader again. For different wall structures, the requirements for slotting are also different: the load-bearing wall in the house is not allowed to be slotted, and the wall with insulation layer is easy to cause cracking on the surface after slotting, while the slotting on the ground should be careful not to damage the floor, causing trouble to the downstairs residents

7 steal index of wall and floor tile paving: ★★

phenomenon: paving wall and floor tiles is a highly technical process. If the workers cut corners, they are most likely to have problems such as hollowing of tiles and uneven joints. In addition, the cement and adhesive used for paving tiles are also exquisite. If the proportion is unreasonable, there will also be problems such as falling off. In addition, the whole wall is prone to stubble, so we should design it in advance at the position of the wall

experts remind: according to the "quality acceptance standard for family room decoration engineering" issued by the Beijing Municipal Construction Commission, it is required that the wall and floor tiles should be paved smoothly and firmly, with clear patterns, no dirt and mortar marks, basically the same surface color, uniform joints, no cracks, corners and missing edges in the plate, and local hollowing should not exceed 5% of the total

8 wire connector steal index: ★★

phenomenon: electricians do not connect wires according to construction requirements when installing sockets, switches and lamps. Especially when consumers use some water heaters, air conditioners and other electrical appliances with large power consumption, switches and sockets are heated and even burned, which brings great losses to consumers

experts remind: during construction, supervise electricians to carry out construction in strict accordance with the operating procedures. After all switches and sockets are installed, be sure to carry out actual use to see whether these parts have heating. 9. Index of stolen work in sewer pipeline: ★★

phenomenon: when the construction team is carrying out decoration, sometimes in order to save trouble, it pours a large amount of cement, sand and concrete fragments into the sewer. The direct consequence of this is to seriously block the sewer, causing the kitchen and bathroom to run away due to poor drainage. Although there is no problem in the final acceptance of some projects, there is always the problem of poor drainage

experts remind: strictly supervise the construction team and do not use sewers as garbage lanes. After the waterway construction is completed, fill all water basins, basins and bathtubs with water, and then drain the water at the same time to see whether the drainage is smooth and whether there is leakage in the pipeline

10 wall painting steal index: ★

phenomenon: latex paint is the most common wall decoration material at present, which can be brushed, roller coated or sprayed in specific construction. If workers are not serious or perfunctory during construction, small color differences often appear. This is especially true of latex paints with darker colors. The effect of mixing more water-saving paint is poor

experts remind: before using emulsion paint, you need to add a certain amount of water, and the prepared emulsion paint should be used up at one time. The paint of the same color should also be painted at one time. If the wall needs to be repaired after construction, the whole wall should be painted again. (it's best for the owner to buy wall paint)

the common construction greasy in the above 10 basically covers all aspects of hard decoration construction, many of which are concealed works. The study found that the majority of concealed works contractors cut corners, so again remind friends to decorate, keep your eyes open, otherwise there will be endless trouble in the future